|
Our expertise in the telecommunications industry is being sought after to consult with builders to advise on viable solutions specific to their needs and carry out the work as required.
 |
 |
Commercial Lead-in Alteration.
Renovations / refurbishment of an old building required the re-location of the Main Distribution Frame (MDF)
and underground 50mm conduit that connects to the Telstra network.
It was a terrific solution recommended and installed by the Phoneworks construction team
which achieved a great result. |
|
|
|
|
|